Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 30

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: Non-static method JSite::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/templates/joostrap/functions/tpl-init.php on line 22

Deprecated: Non-static method JApplication::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/includes/application.php on line 539
ARENA BOULEVARD AT INTERSTATE 5 INTERCHANGE - Projects - Salaber Associates Inc.
Salaber Associates, Inc.
Salaber Associates, Inc.
Corporate Office: 180 South First Street, Suite 10, Dixon, CA 95620
Phone: (707) 693-8800 | Fax: (707) 693-8801
| Email

Engineering Solutions

 

Location: Woodland, CA

Client: City of Woodland Community Development

Construction Value: $7.5 Million

Services Provided: Full Construction Administration and Inspection

The project involved the construction of multiple highway ramps, widening of the Interstate 5 freeway, new city streets, curb, gutter and sidewalk, landscaping, signalized intersections, street lights, several large storm drain systems, utility relocations, and a new 88 meter, 6-lane wide, cast-in-place pre-stressed (CIP/PS) concrete box girder bridge over Interstate 5.  The project involved widening the existing two (2) lane cast-in-place (CIP) concrete box girder bridge over Interstate 5 to four (4) lanes, adding bike lanes, widening and improving a half a mile of County Road 102, including four intersections, improvements to two (2) Interstate 5 ramps and the construction of a new ramp with metering, utility work, large diameter cast-in-drill hole (CIDH) piles, large freeway sign structures, extensive electrical work, street lighting, both permanent and temporary signalized intersections, and extensive landscaping and irrigation work.