Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 30

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: Non-static method JSite::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/templates/joostrap/functions/tpl-init.php on line 22

Deprecated: Non-static method JApplication::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/includes/application.php on line 539
EIGHT MILE ROAD / INTERSTATE 5 INTERCHANGE IMPROVEMENT - Projects - Salaber Associates Inc.
Salaber Associates, Inc.
Salaber Associates, Inc.
Corporate Office: 180 South First Street, Suite 10, Dixon, CA 95620
Phone: (707) 693-8800 | Fax: (707) 693-8801
| Email

Engineering Solutions

 

Location: Rancho Cordova, CA

Client: City of Rancho Cordova

Construction Value: $13.3 Million

Services Provided: Full Construction Management

The project consisted of widening approximately 3.5 miles of Folsom Boulevard, constructing curb, gutter and meandering sidewalk adjacent to Regional Transit light rail system, constructing new landscaped median with stamped colored concrete, modifying and reconstructing thirteen signalized intersections with new ADA compliant ramps and signal poles, and installing a new signalized pedestrian crossing.  In addition, the work involved the installation of an extensive storm drain system, construction of a 340-foot tieback wall with architectural texture within Caltrans right-of-way, AC pavement construction, base failure removal, removal and replacement of curb, gutter, sidewalk and driveways, slurry seal, decorative street lights, fencing, installing signal interconnect, landscaping and irrigation systems, and traffic signage and striping.