Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 30

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: Non-static method JSite::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/templates/joostrap/functions/tpl-init.php on line 22

Deprecated: Non-static method JApplication::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/includes/application.php on line 539
OAKLAND AIRPORT ROADWAY PROJECTS - Projects - Salaber Associates Inc.
Salaber Associates, Inc.
Salaber Associates, Inc.
Corporate Office: 180 South First Street, Suite 10, Dixon, CA 95620
Phone: (707) 693-8800 | Fax: (707) 693-8801
| Email

Engineering Solutions

 

Location: Lincoln, CA

Client: City of Lincoln Public Works Department

Construction Value: $1.5 Million

Services Provided: On-Call Construction Management and Inspection (Full-Time, Part-Time and Staff Augmentation)

Since 2014 SAI has provided on-call construction management and inspection services on a variety of projects for the City of Lincoln.  These services have been on a full-time, part-time and augmentation basis.  The projects have included Capital Improvement Program (CIP), encroachment permit and private developments, varying in size, scope and complexity.  The projects have ranged from large scale wastewater treatment plant grading and decommissioning, and annual microsurfacing and crack seal programs to local street improvements.  The work has included underground utilities, mass grading, drainage systems, pavement sections, curb, gutter and sidewalk, American with Disabilities Act (ADA) curb ramps, landscaping and other on-site and public right-of-way improvements.  The SAI Resident Engineers and Inspectors have provided project control and documentation in accordance with local agency requirements, including daily documentation on the Virtual Project Management (VPM) system.