Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 30

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: Non-static method JSite::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/templates/joostrap/functions/tpl-init.php on line 22

Deprecated: Non-static method JApplication::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/includes/application.php on line 539
UNION PACIFIC RAILROAD (UPRR) FRESNO SUBDIVISION TRACK IMPROVEMENTS - Projects - Salaber Associates Inc.
Salaber Associates, Inc.
Salaber Associates, Inc.
Corporate Office: 180 South First Street, Suite 10, Dixon, CA 95620
Phone: (707) 693-8800 | Fax: (707) 693-8801
| Email

Engineering Solutions

 

Location: Stockton, CA

Client: City of Stockton

Construction Value: $11.3 Million

Services Provided: Full Construction Administration and Inspection

The project improvements included approximately 4 miles of road widening from 4 lanes to 8 lanes on Hammer Lane and West Lane, removal and construction of several thousand feet of concrete curb, gutter, sidewalk, commercial driveways and handicap ramps, construction of approximately 4,000 lineal feet of precast concrete decorative soundwall, installation of storm drain pipe, catch basins, manholes, fire hydrants, water and sewer services, street lighting and deep lift asphalt paving, asphalt overlay and microsurfacing.  In addition, seven intersections were completely updated with new signals and street lighting, interconnecting, and stamped and colored treated asphalt pavement.  Extensive median landscaping and irrigation activities were also performed consisting of installing valves, irrigation lines, tree wells, and trees throughout project limits.