Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/saiserve/public_html/libraries/joomla/string/string.php on line 30

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/saiserve/public_html/libraries/joomla/filter/input.php on line 652

Deprecated: Non-static method JSite::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/templates/joostrap/functions/tpl-init.php on line 22

Deprecated: Non-static method JApplication::getMenu() should not be called statically, assuming $this from incompatible context in /home/saiserve/public_html/includes/application.php on line 539
UNION PACIFIC RAILROAD (UPRR) SALT LAKE CITY INTERMODAL FACILITY - Projects - Salaber Associates Inc.
Salaber Associates, Inc.
Salaber Associates, Inc.
Corporate Office: 180 South First Street, Suite 10, Dixon, CA 95620
Phone: (707) 693-8800 | Fax: (707) 693-8801
| Email

Engineering Solutions

 

Location: Sacramento, CA

Client: City of Sacramento

Construction Value: $13.5 Million

Services Provided: Project Management and Inspection

The project involved the construction of multiple highway ramps, widening of the I-5 freeway, new city streets, curb, gutter and sidewalk, landscaping, signalized intersections, street lights, several large storm drain systems, utility relocations, and a new 88 meter, 6-lane wide, cast-in-place pre-stressed (CIP/PS) concrete box girder bridge over I-5.  SAI was responsible for the roadway, embankment and utility operations, and for all phases of structure construction, including driving concrete piles, footing construction in the median of the highway, bent and abutment constuction, falsework installation and removal, bridge soffit and lost deck grading, bridge formwork, reinforcement, concrete pours, post-tensioning, bridge deck profilographing and all administrative work.